Select a language:
News

SANTA ANA GARDENS FLOOD CONTROL CHANNEL IMPROVEMENTS STARTING APRIL 29

photo of Santa Ana Gardens Channel-Raitt-Occidental

PROJECT SUMMARY

OC Public Works will complete a flood control restoration project in a portion of the Santa Ana Gardens Channel that runs along South Raitt Street in Santa Ana. Work will include the use of heavy equipment and the placement of large rocks (referred to as “rip rap”) within the channel.

 

WHAT

Crews will perform improvements within the flood control channel in your area to address erosion and ensure the channel is operating effectively for flood protection. 

 

The placement of large rocks (“rip rap”) is a standard flood control measure to reduce erosion of the channel slopes.

 

Residents living in close proximity to the flood channel experience a temporary increase in noise and dust during working hours.

 

Access to the pedestrian/running trail on the west side of the channel will be open during construction.

 

Traffic control/safety measures will be in place. There may be brief delays or stops for the public along the adjacent path for vehicles and equipment entering the work area. Flag personnel will be on site to guide people through the area. 

 

Drivers will have full access to all surrounding roads, yet may experience brief delays at times during certain project activities. 
 
 

WHERE

Santa Ana Gardens flood control channel located in Santa Ana, along the east side of Raitt Street between Edinger Avenue and Occidental Street.

Map of O&M Santa Ana Gardens Channel Project

 

WHEN

  • April 29 - June 29, 2024

  • Monday - Friday, 9 a.m. - 3 p.m.


Schedule is tentative and subject to change.


CONTACT INFORMATION

OCPW Operations & Maintenance (714) 955-0200